彭水水电站施工阶段投资控制中的监理工作
引用本文:包晓黎. 彭水水电站施工阶段投资控制中的监理工作[J]. 西北水电, 2014, 0(6): 106-108
作者姓名:包晓黎
作者单位:中国水利水电建设工程咨询西北有限公司,西安710065
摘    要:水电站施工阶段建设时间长,涉及内容多,投资划分点较多,工程变更多,资金使用额度大,是投资控制工作重要阶段,监理工程师需运用多方面措施来发挥投资控制作用。

关 键 词:施工阶段  监理  投资控制  合同交底  台账管理

Supervision of Investment Control at Construction Stage,Pengshui Hydropower Project
BAO Xiao-li. Supervision of Investment Control at Construction Stage,Pengshui Hydropower Project[J]. Northwest Water Power, 2014, 0(6): 106-108
Authors:BAO Xiao-li
Affiliation:BAO Xiao-li(China Hydro Consulting Engineering Corporation, Northwest Branch, Xi'an 710065, China)
Abstract:The construction stage is the important one for the project investment control, where construction time is long, involvements are various, investment items are many, engineering changes are a lot and investment capital is in a large amount.The Supervision Engineer is required to apply couples of measures to envisage the investment control functions.
Keywords:construction stage supervision investment control contract interpretation log management