首页 | 本学科首页   官方微博 | 高级检索  
     

新建地铁车站电力方沟悬吊保护施工技术
引用本文:韩江波. 新建地铁车站电力方沟悬吊保护施工技术[J]. 山西建筑, 2014, 0(2): 106-108
作者姓名:韩江波
作者单位:北京市轨道交通建设管理有限公司,北京100048
摘    要:以北京地铁九号线丰台科技园站为例,对工程电力管沟与出入口位置关系及管沟内部情况进行了介绍,论述了电力方沟悬吊工程总体施工安排措施,并对悬吊结构作了受力验算,经监测表明该电力方沟悬吊方案是成功的。

关 键 词:电力方沟  悬吊  计算  频率

Construction technology of power square ditch cantilever protection of new subway station
HAN Jiang-bo. Construction technology of power square ditch cantilever protection of new subway station[J]. Shanxi Architecture, 2014, 0(2): 106-108
Authors:HAN Jiang-bo
Affiliation:HAN Jiang-bo ( Beijing Rail Transit Construction Management Co. , Ltd, Beijing 100048, China)
Abstract:Taking Fengtai science and technology park station of Beijing subway line No. 9 as an example, the paper introduces the relationship of engineering power pipe ditch and exit and entrance location and internal conditions of the pipe ditch, discusses the overall construction measures of power square ditch cantilever engineering, and can4es out stress calculation for the cantilever structure. As a result, the monitoring result shows that the power square ditch cantilever scheme is successful.
Keywords:power square ditch   cantilever   calculation   frequency
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号