大红山铜矿二选厂选矿设计中有关问题的探讨
引用本文:李秀芬. 大红山铜矿二选厂选矿设计中有关问题的探讨[J]. 有色金属设计, 2009, 36(3): 45-51,56
作者姓名:李秀芬
作者单位:云南华昆工程技术股份公司,云南,昆明,650051
摘    要:大红山铜矿二选厂由于以处理低品位矿石为主,故效益风险较大。采取措施降低能源和成本,搞好综合利用,提高金属回收率,就成为提高效益、保证项目成功的关键。为适应这一要求,笔者对选矿设计在工艺流程和设备选择等方面所涉及的有关问题进行了探讨,并阐述了该设计的特点和建设效果。

关 键 词:低品位矿石  工艺流程  设备选择  设计特点  建设效果

Discussion on the Related Problems in No. 2 Mineral Processing Plant Design of Dahongshan Copper Mine
LI Xiu-fen. Discussion on the Related Problems in No. 2 Mineral Processing Plant Design of Dahongshan Copper Mine[J]. Nonferrous Metals Design, 2009, 36(3): 45-51,56
Authors:LI Xiu-fen
Affiliation:LI Xiu - fen (Yunnan Huakun Engineering Co. , Ltd. , Kunming 650051, China)
Abstract:There is a larger profit risk because Dahonogshan No. 2 Mineral Processing Plant is mainly to treat low - grade ore. Therefore, to take actions such as reducing energy consumption and cost, doing well in comprehensive utilization, and improving metal recovery is becoming the key point to increase profit and to ensure the project success. In a bid for this requirement, the problems involved in process flow and devices selection during mineral processing design were discussed, and design features and construction effect were expounded.
Keywords:Low - grade ore   process flow   device selection   design feature   construction effect