矿井提升机的调试与试运转
引用本文:徐士虎. 矿井提升机的调试与试运转[J]. 煤炭技术, 2011, 30(7)
作者姓名:徐士虎
作者单位:安徽矿业职业技术学院,安徽,淮北,235000
摘    要:在矿井提升系统安装结束、正式投入使用前,应对矿井提升机进行调试和试运转,通过检测以判断系统是否达到预期的设计目标。文章以2JK-3/11.5型提升机为例,介绍了矿井提升机的调试与试运转具体方法及步骤。

关 键 词:矿井提升机  调试  试运转  步骤

Debugging and Test Run of Mine Hoist
XU Shi-hu. Debugging and Test Run of Mine Hoist[J]. Coal Technology, 2011, 30(7)
Authors:XU Shi-hu
Affiliation:XU Shi-hu(Anhui Mining and Technology College,Huaibei 235000,China)
Abstract:After hoisting system installation termination and before formally put into use,mine hoist should be given a test run and debugging,judging whether the design objective has been achieved or not by testing.The paper introduces the specific methods and steps of debugging and test run of mine hoist through taking hoister of type 2JK-3/11.5 as an example.
Keywords:mine hoist  test  debugging  step  