首页 | 本学科首页   官方微博 | 高级检索  
     

联补水电站闸坝左岸山体整体稳定性研究
引用本文:黄维,任奎. 联补水电站闸坝左岸山体整体稳定性研究[J]. 浙江水利水电专科学校学报, 2009, 21(2): 1-6
作者姓名:黄维  任奎
作者单位:华东勘测设计研究院,浙江,杭州,310014
摘    要:联补水电站施工过程中,左岸山体崩坡积层出现裂缝.通过对地表裂缝发育特征的分析,发现裂缝均为拉张性质,表现出典型的土体蠕变特征,各部位裂缝成因略有差别.通过地表以及深层变形监测数据分析,并采用离散元模拟左岸山体斜坡变形失稳的全过程等,提出了左岸山体整体稳定、无明显的整体变形破坏迹象的重要结论,为工程设计及枢纽安全运行提供了依据.

关 键 词:联补水电站  闸坝  左岸山体  整体稳定性

Research on Overall Stability of Loft Bank Hilly Region in Lianbu Hydropower Station
HUANG Wei,REN Kui. Research on Overall Stability of Loft Bank Hilly Region in Lianbu Hydropower Station[J]. Journal of Zhejiang Water Conservancy and Hydropower College, 2009, 21(2): 1-6
Authors:HUANG Wei  REN Kui
Affiliation:(Survey and Design Institute of Eastern China, Hangzhou 310014, China)
Abstract:The colluvium of left bank hilly region cracked in the construction of Lianbu Hydropower Station, which are proved be tension Cracks because of different reasons in different regions based on the analysis on crack growth of earth surface. The paper draws the conclusion that there is no deforming phenomenon as a whole in left bank hilly region after analysing the monitoring data of surface and underground deformation by gliding simulation on discrete mode.
Keywords:Lianbu Hydropower Station  pier  hilly region of left bank  overall stability
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号