首页 | 本学科首页   官方微博 | 高级检索  
     


Time of Sampling Strategies for Asphalt Pavement Quality Assurance
Authors:Brenda McCabe  Simaan AbouRizk  Jim Gavin
Affiliation:1Assistant Professor, Dept. of Civil Engineering, Univ. of Toronto, Toronto, ON, Canada M5S?1A4.
2Professor, Dept. of Civil and Environmental Engineering, Univ. of Alberta, Edmonton, AB, Canada T6G?2G7.
3Roadway Construction Standards Specialist, Alberta Transportation and Utilities, 4999 98 Ave., Edmonton AB, Canada T6B?2X3.
Abstract:The cost of quality assurance programs in asphalt road construction is high in part because of the need for daily testing. This paper demonstrates the methodology used to investigate the timing of sampling and its effect on the quality assurance program. Fourteen lots over two highway paving projects were tested twice: during construction on a daily basis, and after construction was complete. Three quality measures were compared, namely asphalt content, degree of compaction, and aggregate gradation. The test data during construction were obtained from two sources: the consultant’s quality assurance, and the contractor’s quality control. One-way ANOVA tests and T-tests were used to compare the means. In addition, the arithmetic difference between the means was reviewed to understand how the time of sampling might affect contractor payment adjustments.
Keywords:Asphalt pavements  Quality control  Sampling designs  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号