首页 | 本学科首页   官方微博 | 高级检索  
     


Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Authors:Peter E D Love
Affiliation:Associate Professor, School of Management Information Systems, Edith Cowan Univ., Churchlands, Perth, WA?6018, Australia.
Abstract:While it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework costs were obtained from 161 Australian construction projects. The direct and indirect consequences of rework are analyzed and discussed. It is shown that, contrary to expectation, rework costs do not differ relative to project type or procurement method. In addition, it was found rework contributed to 52% of a project’s cost growth and that 26% of the variance in cost growth was attributable to changes due to direct rework. To reduce rework costs and therefore improve project performance, it is posited that construction organizations begin to consider and measure them, so that an understanding of their magnitude can be captured, root causes identified, and effective prevention strategies implemented.
Keywords:Project management  Costs  Australia  Scheduling  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号