首页 | 本学科首页   官方微博 | 高级检索  
     


Alternative Concession Model for Build Operate Transfer Contract Projects
Authors:L. Y. Shen  H. Li  Q. M. Li
Affiliation:1Associate Professor, Building and Real Estate Dept., Hong Kong Polytechnic Univ., Kowloon, Hong Kong.
2Professor, Building and Real Estate Dept., Hong Kong Polytechnic Univ., Kowloon, Hong Kong.
3Professor, Civil Engineering School, Southeast Univ., Nanjing, China.
Abstract:This paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits, authorities, and responsibilities between the government and private investors. Previous studies have developed various techniques and methods, mainly suggesting proper organization structure, contracting procedures, methods of project financing, and risk allocation strategies when BOT-contract projects are implemented. These works have provided effective methodologies for the development of BOT contracts. Nevertheless, it appears that little has been undertaken in studying the way to determine the concession period in a BOT contract. This paper critically reviews the principles of establishing the concession period in a BOT contract. Such a review leads to developing a quantitative model for determining a proper concession period that can protect the interests of both the government concerned and private investors. An example is given that indicates how the alternative model can be applied to determine the concession periods of BOT infrastructure projects.
Keywords:Infrastructure  Build/operate/transfer  Contracts  Models  Project management  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号