Quantitative Definition of Projects Impacted by Change Orders
Authors:Awad S Hanna  Richard Camlic  Pehr A Peterson  Erik V Nordheim
Affiliation:1Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin-Madison, 2314 Engineering Hall, 1415 Engineering Dr., Madison, WI?53706.
2Process Manager, Sheet Products and Tubular U.S. Steel, Fairfield Works, Fairfield, AL?35064.
3Graduate Research Assistant, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin-Madison, 2314 Engineering Hall, 1415 Engineering Dr., Madison, WI?53706.
4Professor, Dept. of Statistics, Univ. of Wisconsin-Madison, 120 Russell Laboratories, 1630 Linden Dr., Madison, WI?53706.
Abstract:Change, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources of time and money available for planning. Change may occur on a project for a number of reasons, such as design errors, design changes, additions to the scope, or unknown conditions. For each change, contractors are entitled to an equitable adjustment to the base contract price and schedule for all productivity impacts associated with the change. Changes may or may not have an impact on labor productivity. Existing literature uses subjective evaluation to determine whether the project is impacted. Projects impacted by change cause the contractor to achieve a lower productivity level than planned. The focus of this paper is to quantify whether an electrical or mechanical project is impacted by a change order. Through statistical hypothesis testing, groups of factors that correlate with whether a project is impacted by change orders were identified and used to develop a quantitative definition of impact. Logistic regression techniques were used to develop models that predict the probability of a project being impacted. The results of this research show that percent change, type of trade, estimated and actual peak manpower, processing time of change, overtime, overmanning, and percent change related to design issues are the main factors contributing to the project impact.
Keywords:Change orders  Project management  Quantitative analysis  