首页 | 本学科首页   官方微博 | 高级检索  
     

10MW灯泡贯流式水轮机的现场试验
引用本文:张成冠.10MW灯泡贯流式水轮机的现场试验[J].大电机技术,1988(1).
作者姓名:张成冠
作者单位:水电部天津勘测设计院
摘    要:简要介绍了机组基本参数、结构型式和运行概况以及现场试验结果;机组的强度、振动、导轴承与推力轴承实测,过渡过程特性,导叶和桨叶水力矩、导叶漏水量和漏水力矩试验及转轮运行性能等。

关 键 词:强度  振动  过渡过程  力矩  漏水量

Field Test Results of 10MW Bulb Turbine
Zhang Chengguan.Field Test Results of 10MW Bulb Turbine[J].Large Electric Machine and Hydraulic Turbine,1988(1).
Authors:Zhang Chengguan
Affiliation:Tianjin Prospecting and Design Institute of the Ministry of Water Resources and Electric Power
Abstract:This report introduced basic parameters, structural type and operating situation of the unit and field test results, such as stress, vibration, main guide bearing, thrust bearing, transient characteristics, hydraulic moment of wicket gate and runner blade, Wicket gate leakage and leakage moment and operating performance of runner etc.
Keywords:strength  vibration  transient characteristic  moment  leakage
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号