首页 | 本学科首页   官方微博 | 高级检索  
     

三峡工程围堰发电期效益分析
引用本文:胡晓勇,李学贵.三峡工程围堰发电期效益分析[J].水电自动化与大坝监测,2006,30(6):1-3.
作者姓名:胡晓勇  李学贵
作者单位:三峡水利枢纽梯级调度通信中心,湖北省宜昌市,443133
摘    要:运用中长期发电计算方法及统计数据,详细说明了三峡工程围堰发电期防洪、航运及发电效益,着重分析了超发电效益的组成,并由此得出下一步增加发电效益的措施。

关 键 词:三峡工程  围堰发电期  效益
收稿时间:2006-08-30
修稿时间:2006年8月30日

Benefit Analysis for Three Gorges Project During Its Cofferdam Power Generation Period
HU Xiaoyong,LI Xuegui.Benefit Analysis for Three Gorges Project During Its Cofferdam Power Generation Period[J].HYDROPOWER AUTOMATION AND DAM MONITORING,2006,30(6):1-3.
Authors:HU Xiaoyong  LI Xuegui
Affiliation:Three Gorges Cascade Dispatching and Communication Center, Yichang 443133, China
Abstract:The benefit of flood control, navigation and power generation of the Three Gorges Project during its cofferdam power generation period are expounded by means of the medium and long-term power generation calculating method and statistic data. The composition of additional power generation benefit is emphasized, and the measures for more power generation benefit are proposed.
Keywords:Three Gorges Project  cofferdam power generation period  benefit
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水电自动化与大坝监测》浏览原始摘要信息
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号