龙滩水电站4号机调速器试验综述
引用本文:唐扬文.龙滩水电站4号机调速器试验综述[J].云南水力发电,2008,24(4):8-12.
作者姓名:唐扬文
作者单位:中国水利水电第十四工程局机电安装分局,云南,昆明,650032
摘    要:以龙滩4号机为例介绍了龙滩电站调速器试验目的、方法及步骤,并对开、停机试验、空载及甩负荷等试验进行了分析,为类似特大型水电站调速器调试试验积累了经验。

关 键 词:龙滩电站  调速器  试验

An Introduction to No.4 Power Generating Unit's Governor Test for Longtan Hydropower Plant
TANG Yan-wen.An Introduction to No.4 Power Generating Unit''s Governor Test for Longtan Hydropower Plant[J].Yunnan Water Power,2008,24(4):8-12.
Authors:TANG Yan-wen
Affiliation:TANG Yan- wen (General Installation Company of China Water Conservancy and Hydropower Construction Bureau No. 14, Kunming 650032, Yunnan, China)
Abstract:This paper gives an introduction to the purpose, method and steps of the governor test of Longtan Hydropower Plant and makes an analysis of the starting, shutdown, no - load and load rejection tests by taking No. 4 turbine - generator unit for example, thus having accumulated experiences of governor test for large hydropower plants of this kind.
Keywords:Longtan hydropower plant  governor  test