首页 | 本学科首页   官方微博 | 高级检索  
     

重载铁路预应力T梁横向孔道精确定位施工
引用本文:于兆阳.重载铁路预应力T梁横向孔道精确定位施工[J].山西建筑,2014(4):181-183.
作者姓名:于兆阳
作者单位:中国铁建十二局集团第三工程有限公司,山西太原030024
摘    要:通过对重载铁路预制T梁施工工艺的不断优化,总结出了一套完整的横向孔道位置精度控制技术,解决了分片式T梁架设完成后无法准确对位的难题,为后续类似工程提供了借鉴。

关 键 词:铁路T梁  横向孔道  精度定位

Overloaded railway prestressed T beam transverse hole accurate positioning construction
YU Zhao-yang.Overloaded railway prestressed T beam transverse hole accurate positioning construction[J].Shanxi Architecture,2014(4):181-183.
Authors:YU Zhao-yang
Affiliation:YU Zhao-yang (12th bureau of China Railway Construction Group Third Engineering Co. , Ltd, Taiyuan 030024, China)
Abstract:Through the overloaded railway precast T beam construction technology of continuous optimization, summarized a set of complete hori zontal hole position accuracy control technology. Solve the problem of the shard type T beam erection can' t accurate registration, after the com pletion of serving as a reference for subsequent similar engineering.
Keywords:railway T beam  lateral channel  precision positioning
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号