首页 | 本学科首页   官方微博 | 高级检索  
     


Dynamic lot-sizing with rework of defective items and minimum lot-size constraints
Authors:Andreas Goerler
Affiliation:Institute of Information Systems (IWI), University of Hamburg, Hamburg, Germany.
Abstract:In most production processes, defective items may result from an imperfect production system and the need of reworking them is inevitable in many production environments. Despite the great importance of rework in real-world manufacturing, the body of literature is very limited. This paper deals with the effects of defective items and rework on the Capacitated Lot-Sizing Problem (CLSP). We present a mixed-integer programming formulation of the CLSP with rework of defective items and minimum lot-size constraints on production lots. The formulation describes an imperfect production process that leads to a fraction of defective items that have to be reworked before they can be sold to customers. Detailed numerical experiments show that while the occurrence of defective items significantly increases the computational times, reasonably sized minimum lot-size constraints, besides their practical importance, can be a good strategy to accelerate the solution process.
Keywords:lot-sizing  imperfect production  rework  minimum lot-sizes  back-ordering
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号