首页 | 本学科首页   官方微博 | 高级检索  
     

霍尔辛赫煤矿3号煤层皮带巷支护优化分析
引用本文:史东鑫.霍尔辛赫煤矿3号煤层皮带巷支护优化分析[J].煤矿现代化,2021,30(2).
作者姓名:史东鑫
作者单位:山西霍尔辛赫煤业有限责任公司,山西长治 046600
摘    要:本文将霍尔辛赫煤矿3号煤层皮带巷出现的变形破坏问题作为研究对象,对皮带巷出现的变形破坏原因进行了研究,分析认为导致皮带巷出现较大变形破坏的主要因素是巷道所处地段地质条件复杂、原支护设计不合理、围岩自承能力未充分发挥等原因。结合皮带巷所处实际地质条件,设计“锚网索+U钢+柔性层”复合支护方案对皮带巷进行返修,从返修情况来看,取得了较好的返修支护效果。

关 键 词:煤矿  皮带巷  支护优化  分析

Optimization analysis of No.3 coal seam belt support in Horsinghe Coal Mine
SHI Dongxin.Optimization analysis of No.3 coal seam belt support in Horsinghe Coal Mine[J].Coal Mine Modernization,2021,30(2).
Authors:SHI Dongxin
Affiliation:(Shanxi Huo er xinhe Coal Industry Co.,Ltd.,Changzhi046600,China)
Abstract:In this paper,the deformation and failure of Belt Lane in No.3 Coal Seam of Horsinghe Coal Mine is taken as the research object,the cause of deformation and failure of Belt Lane is studied,and the main factor leading to large deformation and failure of Belt Lane is the roadway The geological conditions of the location are complicated,the original support design is unreasonable,and the self-supporting capacity of the surrounding rock is not fully exerted.Combined with the actual geological conditions of the belt roadway,the"anchor net cable+U steel+flexible layer"composite support scheme was designed to repair the belt roadway.From the point of view of the repair work,a better repair support effect was achieved.
Keywords:coal mine  belt roadway  support optimization  analysis
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号