首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈清单计价模式下的工程变更结算
引用本文:王晓萍.浅谈清单计价模式下的工程变更结算[J].新疆钢铁,2009(3).
作者姓名:王晓萍
作者单位:宝钢集团八钢公司设备工程部
摘    要:工程变更结算,是承发包双方确定投资增减的一项关键工作,它直接影响投资的控制目标。只有加强工程变更管理,严格控制工程变更,采用科学的方法,本着合同优先,公平、合理,兼顾工程综合效益的原则,才能做好工程量清单模式下的工程变更结算工作。

关 键 词:工程变更  计价原则  工程结算

Analysis of Project Changing Balance in the Mode of Bill Checking Principle
WANG Xiao-ping.Analysis of Project Changing Balance in the Mode of Bill Checking Principle[J].Xinjiang Iron and Steel,2009(3).
Authors:WANG Xiao-ping
Affiliation:WANG Xiao-ping(Equipment &EngineeringDepartment; Bayi Iron &Steel Co.; Baosteel Group);
Abstract:Project changing balance is an import job to confirm the investment for both contractor and owner.It influences investment control goal directly.The project changing balance could be done well by strengthening the management,controlling the project alteration strictly,adopting scientific way as well as taking contract first as equitable and logical principle,considering project integration benefit at the same time.
Keywords:project changing  checking principle  project balance
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号