论清单计价模式下工程变更的管理
引用本文:黄世娟.论清单计价模式下工程变更的管理[J].山西建筑,2008,34(19).
作者姓名:黄世娟
作者单位:武汉科技学院,湖北,武汉,430073
摘    要:分析了目前国内建筑市场中工程变更管理和控制的现状,针对工程变更的内容及变更的管理程序,论述了工程变更的处理原则、项目各阶段工程变更管理工作的重点及工程量清单计价模式下变更价格的确定方法。

关 键 词:工程变更  设计变更  现场签证  管理  合同

On the management of the engineering change based on the engineering quantity list valuation mode
HUANG Shi-juan.On the management of the engineering change based on the engineering quantity list valuation mode[J].Shanxi Architecture,2008,34(19).
Authors:HUANG Shi-juan
Affiliation:HUANG Shi-juan
Abstract:The author analyzes the present situation of the management and control of the engineering change in the construction market in our country at present,discusses the treatment principles of the engineering change,the emphasis of the engineering change management work of the project in different stage and the determination method of the price of engineering alternation based on the mode of the engineering quantity list valuation according to the content and the management program of the engineering change.
Keywords:engineering change  design alteration  site visa  management  contract