东荣三矿综采工作面处理冒顶方法
引用本文:李同岭.东荣三矿综采工作面处理冒顶方法[J].煤炭技术,2013(5):74-75.
作者姓名:李同岭
作者单位:龙煤矿业集团双鸭山分公司东荣三矿
摘    要:东荣三矿地质条件复杂,断层发育且煤层顶板多为复合型顶板,回采过程中频繁处理架上或架前顶板冒落。该矿采取注罗克休、马丽散或架前打设加强单体的方法处理顶板冒落,较好地控制住破碎顶板,保证了综采快速推进。

关 键 词:综采工作面  马丽散  打设单体  顶板冒落

Treatment Methods of Roof Fall at Fully Mechanized Face in Dongrong No.3 Mine
LI Tong-ling.Treatment Methods of Roof Fall at Fully Mechanized Face in Dongrong No.3 Mine[J].Coal Technology,2013(5):74-75.
Authors:LI Tong-ling
Affiliation:LI Tong-ling(Dongrong No.3 Cood Mine,Shuangyashan Branch,Longmay Group,Shuangyashan 155100,China)
Abstract:The geological conditions of Dongrong No.3 Coal Mine was amplex,it had faults derelopment and multi-seam roof with composite roof.The roof fall above or in front of hydraulic supports frenguently occurred in the mining process.Some measures were adopted to control the roof fall,such as injection of Rockshow and Malisan,setting of strengthing single props.The broken roof was well under control.The rapid excavation of fully mechanized mining was ensured.
Keywords:fully mechanized face  Malisan  setting of single prop  roof fall