仰山一级水电站砌石空腹重力坝施工
引用本文:刘献绩.仰山一级水电站砌石空腹重力坝施工[J].江西水利科技,1992,18(4):305-310.
作者姓名:刘献绩
作者单位:江西省水电工程局
摘    要:仰山一级水利工程,在砌石坝的施工中,其辅助生产系统布置及空腹拱顶模板支架制作,根据现场地形和我局的潜在生产能力,做到了以最大限度地发挥机械化施工的作用。为了保证砌石坝的施工质量,在现场做了大型砌石体干容重试验。

关 键 词:空腹重力坝  机械化施工  水电站

The Construction on stone Masonry Hollow Gravity Dam at the Class One Hydroelectric station in Yangshan
Liu Xianji.The Construction on stone Masonry Hollow Gravity Dam at the Class One Hydroelectric station in Yangshan[J].Jiangxi Hydraulic Science & Technology,1992,18(4):305-310.
Authors:Liu Xianji
Abstract:At the class one Water Conservancy project in Yangshan, during the construction of store masonry dam, based on the field to pographic condition and the potential productivity of our bureau, We have made the best use of the mechanized construction technique such as: the arrangement of assistant producing system, the manufacture of form brace of arch crown. In order to ensure the construction quality, the dry density test of large stone masonry body has been made in the field
Keywords:Stone Masonry-Hollow Gravity Dam  Mechanized Construetion  Drydensity test of large stone masonny bady