首页 | 本学科首页   官方微博 | 高级检索  
     


Filtered-beam-search-based algorithm for dynamic rescheduling in FMS
Authors:Wang Shi-jin  Xi Li-feng  Zhou Bing-hai
Affiliation:aSchool of Mechanical Engineering, Shanghai Jiaotong University, Shanghai, 200030 PR China
Abstract:In the practical production process of a flexible manufacturing system (FMS), unexpected disturbances such as rush orders arrival and machine breakdown may inevitably render the existing schedule infeasible. This makes dynamic rescheduling necessary to respond to the disturbances and to improve the efficiency of the disturbed FMS. Compared with the static scheduling, the dynamic rescheduling relies on more effective and robust search approaches for its critical requirement of real-time optimal response. In this paper, a filtered-beam-search (FBS) -based heuristic algorithm is proposed to solve the dynamic rescheduling problem in a large and complicated job shop FMS environment with realistic disturbances. To enhance its performance, the proposed algorithm makes improvement in the local/global evaluation functions and the generation procedure of branches. With respect to a due date-based objective (weighted quadratic tardiness), computational experiments are studied to evaluate the performance of the proposed algorithm in comparison with those of other popular methods. The results show that the proposed FBS-based algorithm performs very well for dynamic rescheduling in terms of computational efficiency and solution quality.
Keywords:Rescheduling  Heuristic algorithm  Beam search  Flexible manufacturing system  Scheduling
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号