Study on design and construction method for the New Tomei–Meishin expressway tunnels
Authors:Katushi Miura  Hiroshi Yagi  Hiromichi Shiroma  Kazuya Takekuni
Affiliation:a Head of Shizuoka Construction Bureau, Japan Highway Public Corporation (JH), Shizuoka-city, Shizuoka 420-0857, Japan;b Construction Department, Shizuoka Construction Bureau, JH, Shizuoka-city, Shizuoka 420-0857, Japan;c Tunnel Division, Road Research Department, Expressway Research Institute, JH, Machida-city, Tokyo 194-8650, Japan;d Road Engineering Section, Engineering Department, Head Office, JH, Chyoda-ku, Tokyo 100-8979, Japan
Abstract:The New Tomei–Meishin expressway has a high-speed highway facility with six lanes (three lanes for each direction) throughout its total length of 502 km. The expressway is planned to form a new transportation backbone for Japan in the 21st century by connecting between Tokyo and Kobe. This expressway plays a supplemental expressway of the existing Tomei and Meishin expressways. The tunnels on the New Tomei–Meishin expressway have a very large, flattened cross-section of approximately 190 m2 excavation area, while the excavation width is approximately 18 m. There is no previous example of such a huge cross-section in the world. Thus, there are various problems regarding the technical configuration and the support structure in terms of construction such as how to excavate a large group of tunnels safely and efficiently. This paper describes the study and investigation related to design and construction method for large cross-section tunnels located in various ground conditions.
Keywords:Large cross-section  Flatted cross-section  Support  TBM  Dust corrector system
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号