白鹤滩水电站拱坝及坝肩加固效果分析及整体 安全度评价
引用本文:宁宇,徐卫亚,郑文棠,石安池,吴关叶.白鹤滩水电站拱坝及坝肩加固效果分析及整体 安全度评价[J].岩石力学与工程学报,2008,27(9):1890-1890.
作者姓名:宁宇  徐卫亚  郑文棠  石安池  吴关叶
作者单位:1. 河海大学,岩土力学与堤坝工程教育部重点实验室,江苏,南京,210098;河海大学,岩土工程研究所,江苏,南京,210098
2. 中国水电工程顾问集团公司,华东勘测设计研究院,浙江,杭州,310014
基金项目:国家自然科学基金,国家重点基础研究发展计划(973计划)
摘    要: 白鹤滩水电站拱坝左侧坝肩断层及层间、层内错动带发育,拱推力作用下易发生剪切变形。坝基柱状节理层发育,变形模量等力学指标相对较低,表现出显著的各向异性力学特性。由于以上地质缺陷的影响,设计采取沿拱推力方向设置抗剪洞及扩挖坝基处柱状节理层岩体设置垫座的工程处理措施,以期对坝肩、坝基岩体的抗剪、传力等进行改善。采用三维非线性数值分析方法,根据实际地质信息建立三维数值模型,模拟白鹤滩中坝址主要地质现象及相关工程措施,通过坝肩、坝基岩体及坝体的应力、位移对比,定量分析主要地质缺陷的影响以及工程处理措施的效果。采用超载法、强度折减法及点安全系数法评价下坝线拱坝的安全度,为该水电站坝线比选提供技术依据和科研成果支撑。

关 键 词:水利工程拱坝抗剪洞垫座超载法强度折减法点安全系数法
收稿时间:2008-5-19
修稿时间:2008-7-5

REINFORCEMENT EFFECT ANALYSIS AND GLOBAL SAFETY EVALUATION OF ARCH DAM AND ABUTMENT OF BAIHETAN HYDROPOWER STATION
NING YU,XU Weiya,ZHENG Wentang,SHI Anchi,WU Guanye.REINFORCEMENT EFFECT ANALYSIS AND GLOBAL SAFETY EVALUATION OF ARCH DAM AND ABUTMENT OF BAIHETAN HYDROPOWER STATION[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(9):1890-1890.
Authors:NING YU  XU Weiya  ZHENG Wentang  SHI Anchi  WU Guanye
Abstract:As faults,inner layers and interlayer shear bands widely develop in the left dam abutment of Baihetan Hydropower Station,and the fault F33 directly conjoins with the left dam abutment,so,shear deformation easily occurs under the thrust of arch dam. The mechanical indexes of dam foundation such as deformation modulus are relatively small and the anisotropy of dam foundation is obvious due to the development of columnar joints layers. In order to reduce the influence of these geological defects,some engineering measures are taken when designing,such as setting anti-shear tunnel along the direction of arch thrust,the cushion to the rock mass of dam foundation,etc.. These measures will improve the shear and transmission force mode of abutment and foundation to some extent. 3D nonlinear numerical method is applied and 3D numerical model based on geological information is built to simulate certain geological phenomena and related engineering measures in middle dam site of Baihetan Hydropower Station. The safety degree of the downstream dam line is evaluated by overloading method,strength reduction method and point safety factor method. The results obtained by these methods will play a role of support to technical basis and scientific research achievements for choosing dam line.
Keywords:hydraulic engineering  arch dam  anti-shear tunnel  cushion  overloading method  strength reduction method  point safety factor method