首页 | 本学科首页   官方微博 | 高级检索  
     


Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study
Authors:Pablo Cortés  Luis Onieva  José Guadix
Affiliation:1. Department of Industrial Engineering , University of Seville, Camino de los Descubrimientos , s/n, E-41092, Seville, Spain pca@esi.us.es;3. Department of Industrial Engineering , University of Seville, Camino de los Descubrimientos , s/n, E-41092, Seville, Spain
Abstract:In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.
Keywords:motorcycle  assembly line  lead time  simulation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号