Sequence dependent set-up times and job sequencing
Authors:CHARLES H WHITE  RICHARD C WILSON
Affiliation:Department of Industrial and Operations Engineering , University of Michigan , Ann Arbor, Michigan, 48109, U.S.A.
Abstract:On many machine tools the set-up times are sequence dependent; that is, the time to set-up for the new part is dependent upon the part for -which the machine is currently set-up. In scheduling lots on the machine, the set-up time is often a significant component of the total time required to complete each lot. Set-up times are frequently not available to the production scheduler, and when they are, they frequently are only averages which conceal the sequence dependency of the set-up times. In this paper, we first develop a procedure that classifies set-up operations and predicts the set-up times and we then develop a method for sequencing the jobs so as to minimize the total set-up time. An example using real world data is used to illustrate these procedures
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号