首页 | 本学科首页   官方微博 | 高级检索  
     


Efficient methods for scheduling make-to-order assemblies under resource,assembly area and part availability constraints
Authors:R. Kolisch  K. Hess
Affiliation:School of Business and Administration , Northeastern University , Shenyang, Liaoning, 110004, China
Abstract:We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high-volume, discrete maketo-order products. Based on a list scheduling procedure proposed by Kolisch in 1999 we introduce three efficient heuristic solution methods. Namely, a biased random sampling method and two tabu search-based large-step optimization methods. The two latter methods differ in the employed neighbourhood. The first one uses a simple API-neighbourhood while the second one uses a more elaborated so-called 'critical neighbourhood' which makes use of problem insight. All three procedures are assessed on a systematically generated set of test instances. The results indicate that especially the large-step optimization method with the critical neighbourhood gives very good results which are significant better than simple single-pass list scheduling procedures.
Keywords:Supply chain  Bullwhip effect  H control  Dynamic model  Simulation experiment
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号