首页 | 本学科首页   官方微博 | 高级检索  
     


Manufacturing lot-sizing,procurement and delivery schedules over a finite planning horizon
Authors:Deniz Mungan  Junfang Yu
Affiliation:1. North Cyprus TURKCELL, Cyprus Mobile Telecommunication Ltd , Bedreddin Demirel Avenue, Salih Mecit Street, No. 1, Nicosia, Cyprus;2. Department of Engineering Management, Information and Systems , Southern Methodist University , Dallas, TX 75205, USA
Abstract:In this study, an integrated manufacturing system for technology-related companies whose products are experiencing continuous price decrease during the life cycle is studied for optimal procurement, production and delivery schedules over a finite planning horizon. The model considers the inventory cost both at manufacturing and at delivery from supplier. Since the price is continuously decreasing, a manufacturing firm delivers the finished goods in small quantities frequently. Frequent deliveries in small lots are effective to reduce the total cost of the supply chain. The key for high-tech industries is to reduce the inventory holding time since the component prices are continuously decreasing, and this can only be achieved by implementing an efficient supply chain. Therefore, the main purpose of this paper is to develop an integrated inventory model for high-tech industries in JIT environment under continuous price decrease over finite planning horizon while effectively and successfully accomplishing supply chain integration so that the total cost of the system is minimal. An efficient algorithm is developed to determine the optimal or near-optimal lot sizes for raw material procurement, and manufacturing batch under a finite planning horizon. Finally, the solution technique developed for the model is illustrated with numerical examples.
Keywords:manufacturing lot-sizing  procurement  JIT delivery and finite planning horizon
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号