首页 | 本学科首页   官方微博 | 高级检索  
     


Determination of the number of containers,production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1
Authors:B. Hemamalini  Chandrasekharan Rajendran
Affiliation:Industrial Management Division, Department of Humanities and Social Sciences , Indian Institute of Technology Madras , Chennai, 600 036, India
Abstract:In the first part of this paper, we consider a kanban-controlled flowshop and present recursive equations for time-tabling of containers in a given sequence. The flowshop is characterized by the following: a production batch of a part-type (or job) divided into kanban lots or containers; production kanbans to control the loading of containers on machines or workstations; withdrawal kanbans to regulate the movement of containers between two consecutive buffer storages; periodic material handling of containers; dual blocking mechanisms operative on workstations and material handling; and sequence-dependent set-up times of containers. Considering different types of problems, recursive equations have been developed for time-tabling of containers in a given sequence.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号