首页 | 本学科首页   官方微博 | 高级检索  
     


Minimising utility work and utility worker transfers for a mixed-model assembly line
Authors:Emre Cevikcan
Affiliation:Industrial Engineering Department, Faculty of Management , Istanbul Technical University , 34367 Istanbul, Turkey
Abstract:Mixed-model assembly lines (MMALs) are types of production lines that are able to respond to diversified costumers’ demand for a variety of models without holding large inventories. The effective utilisation of a mixed-model assembly line requires the determination of the assembly sequence for different models. In this paper, two objectives are considered in a sequential manner, namely minimising: (i) total utility work, which means work from an additional worker to assist an operator for completion of an assembly task; and (ii) utility worker transfer which states the move of a utility worker to a different segment of the assembly line. First, due to the NP-hard nature of the problem, three heuristic methods are proposed with the aim of minimising total utility work. Then, the solutions which are obtained from the heuristics are improved in terms of the total number of utility worker transfers via a local search based method. Furthermore, the solution approach was applied in a real life mixed model tractor assembly line. Results validated the effectiveness of sequencing approach in terms of solution quality.
Keywords:mixed-model assembly line  sequencing  heuristics  worker transfer
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号