首页 | 本学科首页   官方微博 | 高级检索  
     


Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives
Authors:J Curry  B Peters
Affiliation:J. Curry,B. Peters *
Abstract:Nervousness in machine assignments during rescheduling can cause problems for the implementation of a scheduling system. This paper examines rescheduling due to the arrival of new jobs to the system. Parallel machine scheduling problems with stepwise increasing tardiness cost objectives, non-zero machine ready times, constraints that limit machine reassignments, and machine reassignment costs are considered. Simulation experiments and individual scheduling problems indicate that nervousness can be controlled at a low cost in some parallel machine scheduling environments. The rescheduling problems in the simulation are solved with a branch-and-price algorithm. Significant gains in schedule stability can be achieved by selecting the alternative optimal solution with the fewest machine reassignments.
Keywords:Rescheduling  Schedule nervousness  Parallel machine scheduling
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号