首页 | 本学科首页   官方微博 | 高级检索  
     


Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items
Authors:M. Karimi-Nasab
Affiliation:Department of Industrial Engineering , Iran University of Science and Technology , Narmak , Tehran , Iran
Abstract:The production scheduling problem is to find simultaneously the lot sizes and their sequence over a finite set of planning periods. This paper studies a single-stage production scheduling problem subject to controllable process times and sequence-dependent setups for deteriorating items. The paper formulates the problem by minimising two objectives of total costs and total variations in production volumes simultaneously. The problem is modelled and analysed as a mixed integer nonlinear program. Since it is proved that the problem is NP-hard, a problem-specific heuristic is proposed to generate a set of Pareto-optimal solutions. The heuristic is investigated analytically and experimentally. Computational experiences of running the heuristic and non-dominated sorting genetic algorithm-I over a set of randomly generated test problems are reported. The heuristic possesses at least 56.5% (in the worst case) and at most 94.7% (in the best case) of total global Pareto-optimal solutions in ordinary-size instances.
Keywords:multi-objective  production scheduling  controllable processing time  sequence-dependent setups  deteriorating items  Pareto-optimal solutions
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号