首页 | 本学科首页   官方微博 | 高级检索  
     


A real option-based supply chain project evaluation and scheduling method
Authors:Stephan M Wagner  Sidhartha S Padhi  Ingmar Zanger
Affiliation:1. Department of Management, Technology, and Economics, Swiss Federal Institute of Technology Zurich, Zurich, Switzerlandstwagner@ethz.ch;3. Department of Management, Technology, and Economics, Swiss Federal Institute of Technology Zurich, Zurich, Switzerland
Abstract:Supply chain departments spend their time managing numerous projects that will improve and maintain their supply chains. Recent literature has most frequently described the content of these projects and their scheduling but neglected to include risk and uncertainty in the expected cost, profits and time durations of these projects. In this article, we have introduced real option valuation (ROV) to supply chain project scheduling as a flexible method to quantify those risks. Our proposed two-step framework links ROV to all relevant constraints of a multi-project set-up by binary fuzzy goal programming. We applied the framework to a real-life case study data of 21 projects that were facing numerous risks and resource constraints. The results show how scheduling performance improved in comparison to methods ignoring risk and uncertainty (e.g. net present value-based scheduling). For validation we conducted hypothesis tests and sensitivity analysis, and provide an in-depth discussion. The findings contribute to research and practice by capturing project-related risks and managerial flexibilities in general and in supply chains in particular.
Keywords:supply chain management  real option  project scheduling  binary fuzzy goal programming
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号