首页 | 本学科首页   官方微博 | 高级检索  
     

试用“抻线法”改绘基本网络图
引用本文:陈进良. 试用“抻线法”改绘基本网络图[J]. 辽东学院学报(自然科学版), 2000, 0(1)
作者姓名:陈进良
作者单位:丹东市建筑工程学校!丹东118000
摘    要:本文通过教学实践,针对绘制网络图易发生的错误,提出用“抻线法”改绘基本网络图,寻求更准、快、好的方法。

关 键 词:抻线法  基本网络图  流水段排列  施工专业班组排列  横向断路法  纵向断路法

Tryout of Changing Basic Schedule with Stretching Lies Method
Chen Jinliang. Tryout of Changing Basic Schedule with Stretching Lies Method[J]. Journal of Liaodong University(Natural Sciences), 2000, 0(1)
Authors:Chen Jinliang
Affiliation:Dandong Civil Engineering School
Abstract:According to the teaching practice, This article aims at the common failing in drawing the schedule and makes a suggestion of using the Method of Stretching the lines to change the schedule, which is better and faster than before.
Keywords:schetching lines method   basic schedule   flowing section arrangement   construction professional teams and groups arangement   method of catting off lines horizontally   method of cutting off lines verticax
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号