后垄溪水电站引水隧洞工程案例分析
引用本文:曹仰海.后垄溪水电站引水隧洞工程案例分析[J].广东水利水电,2017(8):22-26.
作者姓名:曹仰海
作者单位:福建省沙县官昌水库管理处,福建 沙县,365512
摘    要:以福建省周宁县后垄溪二级水电站为例,阐述其引水隧洞的水文工程地质条件、施工条件和设计施工方案选取,并对施工过程中遭遇汛期时的度汛措施进行分析,结果表明,通过因地制宜的设计施工方案以及合理的度汛措施选取,使引水隧洞能够长期保证稳定运营,可为类似引水隧洞工程提供一定参考和借鉴。

关 键 词:后垄水电站  引水隧洞  水文工程地质条件  施工方案
收稿时间:2017/4/24 0:00:00
修稿时间:2017/4/24 0:00:00

Case Study of Diversion Tunnel of Houlong Hydropower Station
CAO Yanghai.Case Study of Diversion Tunnel of Houlong Hydropower Station[J].Guangdong Water Resources and Hydropower,2017(8):22-26.
Authors:CAO Yanghai
Affiliation:Administrative Office of Guanchang reservoir of Shaxian, Fujian,Shaxian 365512, China
Abstract:Taking example of the Houlong second-cascade hydropower station in Zhouning, the hydrogeological and engineering geological conditions, construction conditions and the design and construction scheme selection of its diversion tunnel are introduced, and the flood control measure in the construction during flood season is also analyzed. It indicates that through appropriate design and construction plan as well as flood control measure, the diversion tunnel can work steadily. The conclusion can provide some reference for the construction of similar diversion tunnels in the future.
Keywords: