基金项目:广东省水利科技创新项目
摘    要:大坝水库坝后坡长期渗漏严重,为此采用CCTV管道内窥仪、探地雷达、高密度电法仪和表面波地震仪等先进仪器设备对坝体渗漏原因进行检查探测,根据探测成果提出采用旋喷桩墙的防渗治理方案,通过科学施工后,坝体防渗墙平均渗透系数小于1.0×10~(-5)cm/s,坝体渗漏得到有效控制,大坝渗漏探测治理模式可供类似工程参考。

关 键 词:土石坝  渗漏  探测  治理
收稿时间:2017/1/4 0:00:00
修稿时间:2017/1/4 0:00:00

Leakage Causes of Daba Reservoir Dam and Its Countermeasures
YANG Wenbin,LI Deji,WANG Ruilan,XU Yunqian,LIU Jianwen,XIA Tian and ZENG Jinhui.Leakage Causes of Daba Reservoir Dam and Its Countermeasures[J].Guangdong Water Resources and Hydropower,2017(3):55-59, 67.
Authors:YANG Wenbin  LI Deji  WANG Ruilan  XU Yunqian  LIU Jianwen  XIA Tian and ZENG Jinhui
Affiliation:Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.,Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.,Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.,Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.,Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.,Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China. and Guangdong Research Institute of Water Resources and Hydropower,Dam safety technology management center of Guangdong Province,Guangdong Technical Research Centre of Flood Disaster Emergency,Guangdong Hydraulics Key Research Base,Guangzhou 510635,China.
Abstract:There is serious long-term leakage in downstream slope of Daba reservoir dam, CCTV pipe endoscope, ground penetrating radar, high density electrical instrument and surface wave seismograph and other advanced equipments have been used to detect the reasons of dam leakage.According to the results of detection, anti seepage scheme of the technology of spiral spray pile has been proposed.Through scientific construction, seepage coefficient of dam wall is less than 1.0×10-5cm/s, and the seepage of dam is treated effectively.The dam leakage detection and control mode in this paper can be used as a reference for similar projects.
Keywords:earth rock dam  leakage  detection  control