考虑风电并网友好性的日前分层调度计划模型
引用本文:张高航,李凤婷,周强,高光芒,周红莲.考虑风电并网友好性的日前分层调度计划模型[J].电力系统保护与控制,2019,47(6):118-124.
作者姓名:张高航  李凤婷  周强  高光芒  周红莲
作者单位:可再生能源发电与并网技术教育部工程研究中心(新疆大学),新疆乌鲁木齐,830047;国网甘肃电力有限公司风电技术中心,甘肃兰州,730050;国网新疆电力有限公司,新疆乌鲁木齐,830063;国网新疆电力有限公司经济技术研究院,新疆乌鲁木齐,830011
基金项目:新疆维吾尔自治区科技援疆专项资助(2017E0277);国家电网科技项目资助(52272716000M)
摘    要:为了最大程度消纳风电及激励风电场改善并网特性,提出了一种考虑风电并网友好性的日前分层调度计划模型。上层调度模型中,通过风电和常规机组的协调调度,实现系统综合成本最小的目标。下层调度模型中,建立风电友好性评估模型对风电场并网友好性予以评估。以风电功率预测信息及上层调度模型的风电出力计划等作为约束,制定各风电场的日前调度出力计划。最后通过在IEEE 30节点系统进行算例仿真,验证了该方法的有效性。

关 键 词:风电  并网友好性  分层调度  电量约束  调度计划
收稿时间:2018/4/8 0:00:00
修稿时间:2018/5/17 0:00:00

Day-ahead hierarchical dispatching model considering friendliness of wind power
ZHANG Gaohang,LI Fengting,ZHOU Qiang,GAO Guangmang and ZHOU Honglian.Day-ahead hierarchical dispatching model considering friendliness of wind power[J].Power System Protection and Control,2019,47(6):118-124.
Authors:ZHANG Gaohang  LI Fengting  ZHOU Qiang  GAO Guangmang and ZHOU Honglian
Affiliation:Engineering Research Center for Renewable Energy Power Generation and Grid Technology Xinjiang University, Ministry of Education, Urumqi 830047, China,Engineering Research Center for Renewable Energy Power Generation and Grid Technology Xinjiang University, Ministry of Education, Urumqi 830047, China,Wind Power Technology Center, State Grid Gansu Electric Power Co., Ltd, Lanzhou 730050, China,Dispatching and Communication Center, State Grid Xinjiang Electric Power Co., Ltd., Urumqi 830063, China and Economic Research Institute, State Grid Xinjiang Electric Power Co., Ltd, Urumqi 830011, China
Abstract:A day-ahead hierarchical dispatching model considering friendliness of wind power is proposed to maximize accommodation of wind power and encourage wind farms to improve grid integration characteristics. In the upper-layer dispatching model, the minimum comprehensive cost of the system is achieved through coordinating dispatching of wind farms and conventional units. In the lower-layer dispatching model, the wind power friendliness evaluation system is established to evaluate the friendliness of wind farms. With prediction information and upper-layer dispatching model dispatching plan of wind power as constraints, a day-ahead dispatching plan of every wind farm is formulated. Simulations on an IEEE 30-bus system demonstrate the effectiveness of the proposed methodology. This work is supported by Science and Technology Supporting Xinjiang Foundation of Xinjiang Uygur Autonomous Region (No. 2017E0277) and Science and Technology Project of State Grid Corporation of China (No. 52272716000M).
Keywords:wind power  grid integration friendliness  hierarchical dispatch  electricity constraint  dispatching schedule
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息