首页 | 本学科首页   官方微博 | 高级检索  
     

重合闸与低电压穿越相配合的有源配电网故障恢复方案
引用本文:王志涛,武志刚,高厚磊,李倩.重合闸与低电压穿越相配合的有源配电网故障恢复方案[J].电力系统保护与控制,2019,47(3):81-87.
作者姓名:王志涛  武志刚  高厚磊  李倩
作者单位:国网山东省电力公司莱芜供电公司,山东 莱芜,271100;山东大学电气工程学院,山东 济南,250061
基金项目:国家自然科学基金项目资助(51377100);国网山东省电力公司科技项目资助(52061216000M)
摘    要:分布式电源的接入给配电网的运行方式带来了较大影响,同时也使配电网对故障恢复方案提出了更高的要求。通过对配电网重合闸和分布式电源处电压变化的分析,考虑重合闸对DG低电压穿越的影响,提出了一种重合闸与低电压穿越相配合的有源配电网的故障恢复方案。该方案预先对分布式电源划分计划孤岛区域,并根据故障位置、孤岛区域以及分布式电源处电压变化等不同故障情况对有源配电网实施不同的供电恢复方法。最后通过PSCAD模型仿真验证了所提方案的可行性和有效性。

关 键 词:有源配电网  故障恢复  计划孤岛  分布式电源  电压跌落
收稿时间:2018/3/1 0:00:00
修稿时间:2018/7/21 0:00:00

A fault recovery scheme cooperating with reclosing and LVRT for active distribution network
WANG Zhitao,WU Zhigang,GAO Houlei and LI Qian.A fault recovery scheme cooperating with reclosing and LVRT for active distribution network[J].Power System Protection and Control,2019,47(3):81-87.
Authors:WANG Zhitao  WU Zhigang  GAO Houlei and LI Qian
Affiliation:Laiwu Power Supply Company, State Grid Shandong Electric Power Company, Laiwu 271100, China,Laiwu Power Supply Company, State Grid Shandong Electric Power Company, Laiwu 271100, China,School of Electrical Engineering, Shandong University, Jinan 250061, China and School of Electrical Engineering, Shandong University, Jinan 250061, China
Abstract:The integration of distributed generation brings great change to the operation mode of the distribution network, and higher requirements have also been set for the fault recovery scheme. By analyzing the relationship between fault reclosing and voltage variation of the distributed generation in distribution network and considering the influence of reclosing on LVRT of DG, this paper proposes a new fault recovery scheme cooperating with reclosing and Low Voltage Ride Through (LVRT) for active distribution network. The planned isolated island area is divided in advance for each DG, and different fault recovery methods are implemented according to the different fault conditions of the fault location, the isolated island area and the voltage variation of the distributed generation. The feasibility and effectiveness of the proposed scheme are verified by simulation in PSCAD. This work is supported by National Natural Science Foundation of China (No. 51377100) and Science and Technology Project of State Gird Shandong Electric Power Company (No. 52061216000M).
Keywords:active distribution network  fault recovery  pre-planned islanding  DG  voltage drop
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号