Development and adoption of measures for increasing the safety of power-generating units of nuclear power plants with RBMK reactors in 1986–2005
Authors:V P Vasilevskii  M N Mikhailov  A A Petrov  M I Rozhdestvenskii  Yu M Cherkashov
Affiliation:(1) N. A. Dollezhal’ Research and Design Institute for Electric Technology, Russia
Abstract:The basic stages and directions of upgrading and reconstruction of the power-generating units of nuclear power plants with RBMK reactors over a period of 20 yr since the Chernobyl accident are reflected in this paper. The greatest amount of work was done in 1986–1990 on all units with RBMK-1000 and-1500 reactors which were operating at that time in the USSR. The purpose of the upgrade was to improve the neutron-physical characteristics of the reactor cores, increase the response speed of the safety and control system and decrease the positive effect of water outflow from the cooling loop of this system, increase the flow capacity of the systems performing emergency discharge of the steam-gas mixture from the reactor, and improve the basic operating documentation. The subsequent stages of the upgrading and reconstruction concerned mainly the first-generation power-generating units (Nos. 1 and 2 units of the Leningrad and Kursk nuclear power plants). These works were performed to make the power-generating units conform to the requirements of the modern normative documents on safety and allow for the possibility of these units to remain in operation after the nominal 30-yr service life has been exhausted. __________ Translated from Atomnaya énergiya, Vol. 100, No. 4, pp. 312–320, April, 2006.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号