首页 | 本学科首页   官方微博 | 高级检索  
     

某工程锤击沉管灌注桩施工对相邻建筑物的影响
引用本文:何六一.某工程锤击沉管灌注桩施工对相邻建筑物的影响[J].安徽建筑,2007,14(4):106-107,112.
作者姓名:何六一
作者单位:庐江县建设工程质量监督站,安徽,巢湖,231500
摘    要:文章介绍了在某工程锤击沉管灌注桩施工期间对相邻建筑物裂缝及损伤的检测过程,对裂缝成因及桩基施工对相邻建筑物的影响进行了分析,对类似工程有一定的参考价值。

关 键 词:锤击沉管灌注桩  既有建筑  裂缝
文章编号:1007-7359(2007)04-0106-03
修稿时间:2007-05-09

Influence of Hammered Cast-in-place Pile Construction on Surrounding Buildings in a Project
He Liuyi.Influence of Hammered Cast-in-place Pile Construction on Surrounding Buildings in a Project[J].Anhui Architecture,2007,14(4):106-107,112.
Authors:He Liuyi
Affiliation:Lujiang Supervision Station for Engineering Quality, Chaohu 231500, China
Abstract:During hammered east-in-place pile construction in a project, crack and damage inspection to the buildings beside the construction site is presented; analysis of cracking reasons and influence of pile foundation construction on surrounding building is made, which is of certain referential value to the similar project engineering.
Keywords:hammered cast-in-place pile  standing bttilding  crack
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号