龙滩水电站截流设计与施工
引用本文:宋亦农,周洁,李勇刚. 龙滩水电站截流设计与施工[J]. 红水河, 2004, 23(4): 1-3,8
作者姓名:宋亦农  周洁  李勇刚
作者单位:武汉大学水利水电学院,湖北,武汉,430072;中南勘测设计研究院,湖南,长沙,410014
摘    要:龙滩水电站于2003年11月6日胜利实现大江截流。论文论述了截流前对截流时间、方式及戗堤布置进行了精心设计,并对戗堤轴线、龙口位置及宽度、抛投材料进行了合理选择,保证了截流的顺利实施。

关 键 词:截流  设计与施工  立堵  龙滩水电站
文章编号:1001-408X(2004)04-0001-04

Design and Construction of River Closure for Longtan Hydropower Projec
SONG Yi-nong,ZHOU Jie,LI Yong-gang. Design and Construction of River Closure for Longtan Hydropower Projec[J]. Hongshui River, 2004, 23(4): 1-3,8
Authors:SONG Yi-nong  ZHOU Jie  LI Yong-gang
Affiliation:SONG Yi-nong~1,ZHOU Jie~2,LI Yong-gang~2
Abstract:The river closure was successfully completed on Nov. 6, 2003 for Longtan project. It describes the careful selection of closure time, method, arrangement of dike lay, selection of dike axis, location and width of the gap, and the throwing material for final closure, which ensure the successful closure.
Keywords:river closure  design and construction  end-tipped closure  Longtan power station