A multi-objective short term hydropower scheduling model for peak shaving
Affiliation:1. School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China;2. Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China;1. School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China;2. Bureau of Hydrology, ChangJiang Water Resources Commission, Wuhan 430010, China;3. Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China;1. Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China;2. School of Electrical Engineering, Dalian University of Technology, Dalian 116024, China;1. School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan, 430074, China;2. Bureau of Hydrology, ChangJiang Water Resources Commission, Wuhan, 430010, China;3. School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou, 450046, China;4. Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian, 116024, China;1. Faculty of Electrical and Computer Engineering, University of Tabriz, Tabriz, Iran;2. Department of Architectural Engineering, Pennsylvania State University, PA, USA;3. Institute of Research and Development, Duy Tan University, Da Nang, 550000, Vietnam
Abstract:The short-term scheduling problem of a hydropower system in China Southern Power Grid (CSG) is studied. As one of the largest in China, the system consists of 92 hydro plants with total installed capacity of 41GW occupying 14.7% of the national hydropower capacity at the end of 2013. Abundant hydroelectricity of the system is transmitted from the western provinces to the eastern load centers in CSG. Obvious difficulties of the hydropower scheduling of CSG are large-scale system, complex constraints and multiple power receiving grids of single plants and cascaded systems due to huge capacity. A short-term hydropower scheduling model for peak shaving of multiple power grids is developed for the operations of the hydropower system of CSG. The model is composed of multi-objective optimal peak shaving (MOPS) model, inter grid power distribution (IGPD) model and load fluctuation balance (LFB) model. The MOPS model minimizes the maximum residual loads of each power grid in which the IGPD model is embedded to distribute power of a plant among several power grids. To solve the model, an aggregate function and a multi-objective fuzzy optimization model are combined to establish an alternative objective function, and a proposed constraint successively satisfying (CSS) algorithm is used to address the period coupling constraints in local search. A case study shows that the proposed approach is practicable, adaptable and robust to obtain near optimal results efficiently, and is applicable for large-scale hydropower systems with both multiple and single power receiving grids.
Keywords:Hydropower systems  Short term  Scheduling  Multi-objective  Power grid
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号