Extending the time-to-overhaul of T-250/300-240 turbines built by the ural turbomotor plant and managed by Mosénergo |
| |
Authors: | V. F. Rezinskikh G. D. Avrutskii M. V. Fedorov S. A. Bykov |
| |
Affiliation: | (1) JSC All-Russian Thermotechnical Institute (VTI), Moscow, Russia;(2) JSC Mosénergo, Moscow, Russia |
| |
Abstract: | The paper discusses the condition of 19 turbines operated by the publicly owned joint-stock company Mosénergo, which have exhausted their time to overhaul (220,000 hours, 600 starts). An extension in the time-to-overhaul of all 19 turbines to 300,000 hours or 900 start ups with the condition that a number of mandatory measures be taken is an acknowledged possibility, based on calculations performed and analysis of damage sustained. A number measures, which have themselves been positively recommended for certain turbines, are examined, and a procedure is presented for evaluating the effectiveness of their implementation. __________ Translated from élektricheskie Stantsii, No. 6, pp. 4–8 (2006). |
| |
Keywords: | Turbine time-to-overhaul impeller cooling systems efficiency seals heating and power plant valves unit |
本文献已被 SpringerLink 等数据库收录! |
|