金竹山电厂50MW机组启停调峰试验研究
引用本文:林任魁,杨继明,欧阳昌盛. 金竹山电厂50MW机组启停调峰试验研究[J]. 大众用电, 1995, 0(6)
作者姓名:林任魁  杨继明  欧阳昌盛
作者单位:长沙电力学院
摘    要:通过试验分析,金竹山电厂50WM机组可采用启停调峰运行方式;提出了一些改进方法和措施;找出了最佳的启停方案。

关 键 词:汽轮机,锅炉,调峰

Study of the Test of the On-off Load-Ad-justment of the 50MW Generator in Jin Zhu ShanPower Plant
Lin Renkui,Yang Jiming,Ouyang Chang-sheng. Study of the Test of the On-off Load-Ad-justment of the 50MW Generator in Jin Zhu ShanPower Plant[J]. Popular Utilization of Electricity, 1995, 0(6)
Authors:Lin Renkui  Yang Jiming  Ouyang Chang-sheng
Affiliation:Lin Renkui;Yang Jiming;Ouyang Chang-sheng
Abstract:After tbe study of the test,the pa-per puts forward the idea that the on-off load-adjustment operation can be applied to the 50MWgenerators in Jin Zhu Shan Power Plant,and thepaper also makes some suggestions of the waysand measures of the improvement.The paper sug-gests the best an-off operation way.
Keywords:Turbagenerater  Furnace  Load ad-justmemt