加大开发水电力度 尽快兴建小湾电站
引用本文:段荣国.加大开发水电力度 尽快兴建小湾电站[J].云南水力发电,1998,14(4):1-8.
作者姓名:段荣国
作者单位:国家电力公司昆明勘测设计研究院
摘    要:随着三峡站的修建,全国大区电网联网的形势即将到来。当前电力供求关系相对缓和;贷款利率降,投资渠道拓宽,这正是加大开发力度的大好时机。对云南来讲,也应抓住这个这有利时机,促使澜沧江中下游河段的关键工程小湾水电站尽快兴建,以满足下世纪实云南电力的需求,沏义改善云南电力系统不合理的结构,实现云电外送,参与全国电力补偿调节。

关 键 词:小湾水电站  水电开发  澜沧江

Amplifying Hydropower Development Intensity, Constructing the Xiaowan Hydropower Project As Early As Possible
Duan,Rongguo.Amplifying Hydropower Development Intensity, Constructing the Xiaowan Hydropower Project As Early As Possible[J].Yunnan Water Power,1998,14(4):1-8.
Authors:Duan  Rongguo
Affiliation:Kunming Hydroelectric Investigation Design and Research Institute under State Power Corporation Kunming 650051
Abstract:With construction of the Three Gorges Hydropower Project the regional power grid interconnection is about to be implemented in China. At present the relation between power supply and demand is improved, the loan interest rate is reduced and the investment channel is broadened up.This creates a golden opportunity to amplify intensity of hydropower development. For Yunnan Province where the Xiaowan Hydropower Project is located this favorable opportunity should be seized to promote constructing the key Xiaowan Hydropower Project on the middle lower reaches of the Lancang River as early as possible so that the power demand of Yunnan Province at the beginning of the next century could be met, the structure of the Yunnan power system could be greatly improved and power could be transferred to other provinces,and abroad, thus allow the Yunnan power system to participate in the national power compensation regulation.
Keywords:Hydropower  development        Lancang  River    Wiaowan  Hydropower Project  