首页 | 本学科首页   官方微博 | 高级检索  
     

设备安装标高控制施工技术讨论
引用本文:杨正秀. 设备安装标高控制施工技术讨论[J]. 山西建筑, 2009, 35(26): 131-133
作者姓名:杨正秀
作者单位:青海桥头铝电有限公司,青海,西宁,810100
摘    要:就设备无垫板安装工艺——顶丝调整法以及坐浆法作了介绍,详细阐述了坐浆法施工中坐浆坑凿出、坐浆材料选取及配比、坐浆盒制作、垫板标高确定及坐浆垫块养护等工艺,以完善设备安装标高控制技术。

关 键 词:设备安装  标高控制  顶丝调整法  坐浆法  垫块

Discussion on the equipment installation level control construction technology
YANG Zheng-xiu. Discussion on the equipment installation level control construction technology[J]. Shanxi Architecture, 2009, 35(26): 131-133
Authors:YANG Zheng-xiu
Affiliation:YANG Zheng-xiu
Abstract:The equipment installation process without backing plate,i.e.jackscrew top thread method,and the bed pulp method were introduced,the bed pit chisel,bed pulp material choice and mix ratio,bed pulp box production,backing plate level determination and bed pulp backing plate maintenance in the bed pulp method were detail illustrated,so as to complete equipment installation level control technology.
Keywords:equipment installation  level control  jackscrew top thread method  bed pulp method  backing plate
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号