浅谈新时期特大型火力发电厂生产准备工作
引用本文:高继业,李树民,刘志杰,陈建军,宁献武. 浅谈新时期特大型火力发电厂生产准备工作[J]. 电力技术, 2010, 0(7)
作者姓名:高继业  李树民  刘志杰  陈建军  宁献武
作者单位:神华国华绥中发电有限责任公司
摘    要:新时期特大型火力发电厂的建设,必须经历由前期准备到项目立项、设计施工、安装调试、试运行、正式投产发电的一系列漫长阶段。生产准备工作必须以明快、可操、实用、效益为主线,实现基建生产的无缝连接和平稳过渡。

关 键 词:火力发电厂  基建生产一体化  生产准备工作

Discuss on the Production Preparation of Ultra Large-scale Thermal Power Plant in New Age
GAO Ji-ye,LI Shu-min,LIU Zhi-jie,CHEN Jian-jun,NING Xian-wu. Discuss on the Production Preparation of Ultra Large-scale Thermal Power Plant in New Age[J]. , 2010, 0(7)
Authors:GAO Ji-ye  LI Shu-min  LIU Zhi-jie  CHEN Jian-jun  NING Xian-wu
Abstract:The construction process of ultra large-scale thermal power plant in new age has to experience a long term which includes multiple phases from earlier preparation project approval,design and construction,installation and commissioning,to trial operation and formally putting into operation.The production preparation must be clear,fast, operable,practical and effective,to realize the seamless connection and the smooth transition of the capital construction and the production.
Keywords:thermal power plant  integration of capital construction and production  production preparation