首页 | 本学科首页   官方微博 | 高级检索  
     

东莞轨道交通R2线新城中心站换乘方案探讨
引用本文:胡世群.东莞轨道交通R2线新城中心站换乘方案探讨[J].山西建筑,2010,36(12):14-15.
作者姓名:胡世群
作者单位:中铁隧道勘测设计院有限公司,天津,300000
摘    要:以东莞大道及西平二路地段建设地下车站为例,从技术、经济、施工等方面进行了方案选择的论述,突出了方案选择以"功能合理、节省投资"为设计原则,以方便乘客换乘。

关 键 词:轨道交通  换乘方案  功能  规划  投资

A study on the transformation program on center metro station R2 line in Dongguan
HU Shi-qun.A study on the transformation program on center metro station R2 line in Dongguan[J].Shanxi Architecture,2010,36(12):14-15.
Authors:HU Shi-qun
Abstract:Taking underground stations construction in the zone between Dongguan road and West ping road No.2 as an example,this thesis discusses program options from the technical,economic,construction and other aspects,highlight the design principle "reasonable function and to save investment" in program selection,so as to facilitate the transfer of passengers.
Keywords:metro traffic  transfer programs  functions  planning  investment
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号