江垭水利枢纽工程设计与施工综述
引用本文:唐国进.江垭水利枢纽工程设计与施工综述[J].水力发电,1999(7):8-12.
作者姓名:唐国进
作者单位:水利部,湖南省澧水流域水利水电综合开发公司,长沙,410007
摘    要:江垭水利枢纽大坝为全断面碾压混凝土坝,坝高131m,混凝土总量134万m^3,是目前世界上已建和在建最高的碾压混凝土大坝之一。坝体部分为三级配碾压混凝土,防渗部分为二级配碾压混凝土,经坝体钻孔取心和压水试验混凝土质量良好,最长心样长为66.67m。地下厂房是湖南省最大的地下厂房,装机300MW,地下洞室群开挖采用新奥法施工。

关 键 词:全断面  碾压混凝土坝  地下厂房  设计  施工

A summary of the design and construction of Jiangya Water Control Project
Tang Guojin.A summary of the design and construction of Jiangya Water Control Project[J].Water Power,1999(7):8-12.
Authors:Tang Guojin
Affiliation:Lishui River Water Resources and Hydropower Development Company of the Ministry of Water Resources and Hunan Province
Abstract:The dam for Jiangya Water Control Project is a full face RCC dam, with the dam height of 131 m and the total concrete volume of 1 34 million m 3. It is the highest completed RCC dam in the world at present. The part of dam body is made by third grade RCC and the part of seepage control is made by second grade RCC. The core sample and the water pressure test showed that the quality of RCC is good. The longest sample is 6.67 m. Its underground powerhouse is the largest one in Hunan Province, with the installed capacity of 300MW. The underground chamber group was excavated by the new Austrian boring method.
Keywords:full  face RCC dam  underground powerhouse  design  construction  quality control  Jiangya Water Control Project