大跨度单索面不对称斜拉桥主梁悬臂施工技术研究 |
| |
引用本文: | 李定达.大跨度单索面不对称斜拉桥主梁悬臂施工技术研究[J].重庆建筑,2008(12). |
| |
作者姓名: | 李定达 |
| |
作者单位: | 中铁八局集团第三工程有限公司,贵州贵阳,550007 |
| |
摘 要: | 重庆市涪陵乌江二桥主桥为100m+340m+150m的高低塔、不等跨、不对称、单索面斜拉桥,桥梁设计新颖,施工技术复杂。本文以该桥为例,着重介绍了大跨度、单索面、不对称斜拉桥主梁悬臂施工过程中挂篮、斜拉索、0#块支架平台、合龙段、施工控制等方面的关键技术。
|
关 键 词: | 大跨度 单索面不对称 斜拉桥 主梁施工 关键技术 |
Cantilever Construction Technology for the Main Beam of Long-Span Single-Cable-Plane Cable-Stayed Bridge |
| |
Authors: | Li Ding-da |
| |
Abstract: | The main bridge of the second Wujiang River Bridge in FuLing,Chonqing is a single cable plane cable-stayed bridge with unequal height pylons,unequal span and asymmetric characteristic,which has novel design and complex construction technology.This article introduced the key technology for the Main Beam of Long-Span Single-Cable-Plane Cable-Stayed Bridge from the following aspects:hanging basket,stay cable,0#block supporting platform,closure segment and construction control. |
| |
Keywords: | long-span single cable plane cable-stayed bridge main beam construction key technology |
本文献已被 CNKI 维普 万方数据 等数据库收录! |
|