首页 | 本学科首页   官方微博 | 高级检索  
     

刚果(金)Sicomines铜矿水文地质条件和疏干方案研究
引用本文:折书群.刚果(金)Sicomines铜矿水文地质条件和疏干方案研究[J].工程勘察,2011(9):46-50.
作者姓名:折书群
作者单位:华北有色工程勘察院;
摘    要:Sicomines铜矿是世界级特大型铜矿,是在前人开采18年停产15年后重新扩大规模开发的矿山,矿区为加丹加矿脉的一部分,区域地层主要为罗安群和孔德龙古群,罗安群及其矿脉中白云石和白云质砂岩交替出现,地层、水文地质条件导致背斜向斜地层深度破碎,含水层厚度大,富水性透水性强。在详细分析矿区水文地质条件的基础上,从水文地质...

关 键 词:矿山开采  地下水  疏干方案

Study on hydrogeological conditions of Sicomines copper mine in Democratic Republic of Congo and its drainage scheme
She Shuqun.Study on hydrogeological conditions of Sicomines copper mine in Democratic Republic of Congo and its drainage scheme[J].Geotechnical Investigation & Surveying,2011(9):46-50.
Authors:She Shuqun
Affiliation:She Shuqun(The North China Investigation Institute of Non-Ferrous Metal Engineering,Shijiazhuang 050021)
Abstract:Sicomines copper mine in Congo is a super-huge copper mine in the world,and it will be exploited after being exploited for about 18 years and suspend mining for about 15 years.The mine is a part of the Katanga system.The stratigraphy is divided into the Roan and Kundelungu series.The Roan series and its seriedes mines are a succession of dolomites and dolomitic sandstones.The aquifer with large thickness,large area,high permeability and abundance of groundwater occurs in the mining area because the geologic...
Keywords:mine exploitation  groundwater  drainage scheme  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号