首页 | 本学科首页   官方微博 | 高级检索  
     

钢混连续结合梁施工技术
引用本文:杨明伟. 钢混连续结合梁施工技术[J]. 山西建筑, 2003, 29(5): 80-81
作者姓名:杨明伟
作者单位:中铁十二局集团第四工程公司
摘    要:结合某工程钢混连续结合梁施工实例,介绍了钢混连续结合梁在场地较平坦时钢梁吊装架设及混凝土面板一次现浇的施工方法,通过使用此法,缩短了工期,降低了工程造价,其经济和社会效益显著。

关 键 词:钢混结合梁桥  连续梁  施工
文章编号:1009-6825(2003)05-0080-02
修稿时间:2003-02-24

The construction technology of continuous steel-concrete composite beam bridge
YANG Ming-wei. The construction technology of continuous steel-concrete composite beam bridge[J]. Shanxi Architecture, 2003, 29(5): 80-81
Authors:YANG Ming-wei
Abstract:Combined with continuous steel-concrete composite beam bridge construction in Qinhuangdao-Sheriyang special railway line for passenger transportation the lifting and erection of steel beam and one cast construction method of concrete slab in continuous steel-concrete composite beam bridge construction are introduced. The application of this method reduced the engineering cost and limit time with obvious economic and social benefits.
Keywords:continuous steel-concrete composite beam bridge   continuous beam   construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号